UPS5000-A-500 kVA
User Manual (e-shelter)
3 Installation
Issue 02 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
71
Figure 3-36
Signal cables routed from the bottom
The number and colors of signal cables are for reference only.
----End
Follow-up Procedure
After connecting cables, reinstall the covers of the power distribution subrack, rear
panel, and side panel of the bypass cabinet.
After connecting cables, check that a certain clearance is reserved between the internal
switch (if any) extension pole and power cables to avoid friction.
3.7 Remote EPO