UPS5000-A-500 kVA
User Manual (e-shelter)
3 Installation
Issue 02 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
75
1.
In the scenarios where holes are drilled for routing cables or covers are removed for routing cables,
after routing cables and checking cable connections, use sealing putty to fill in the gap between the
cables and the cabinet.
2.
After verifying the installation, reinstall all the covers.
3.
Do not remove the dustproof cover before power-on to prevent dust inside the UPS.
Figure 3-40
Fill the holes with sealing putty
(1) Paper protective film
(2) Sealing putty
Figure 3-41
Dustproof cover