UPS5000-E-(30 kVA-120 kVA)-FM
User Manual
6 Routine Maintenance
Issue 01 (2020-04-27)
Copyright © Huawei Technologies Co., Ltd.
159
Item
Expected Result
Troubleshooting
from positive terminals to
negative terminals.)
2.
The tightening torque of each
battery screw meets the
requirements of the battery
manufacturer. (A torque
wrench is used for checking
the torque. After checking that
the battery screws meet the
requirements, mark the screws
for later check.)