UPS5000-E-(30 kVA-120 kVA)-FM
User Manual
3 Installation
Issue 01 (2020-04-27)
Copyright © Huawei Technologies Co., Ltd.
69
Figure 3-30
Installing equipotential plate mounting kits
(1) Side panel
(2) Cable trough
Step 5
Place the cable entry cabinet on the right of the UPS cabinet.
Step 6
Install the front and rear connecting kits.