UPS5000-E-(25 kVA-75 kVA)-SM
User Manual (Half Height)
4 LCD and WebUI
Issue 03 (2019-12-13)
Copyright © Huawei Technologies Co., Ltd.
102
Shutting Down the Inverter
You can shut down the inverter manually by pressing
Shutdown
.
Maintaining Batteries
Figure 4-29
Maintaining Batteries screen
Item
Description
Update Installation Date
You can update the battery installation time to the current
system time.
NOTICE
When batteries connect to the UPS for the first time, set
Update
Installation Date
on this screen to ensure the battery installation
time is the same as the current time and avoid the 0036-2
Battery maintenance reminder
alarm.
Forced eql. chg.
Perform equalized charging on batteries forcibly.
Shallow Discharge Test
Partially discharge batteries. A shallow discharge test can
be conducted to test the battery loop reliability and
short-time discharge capacity when the batteries have not
discharged for a long time.
Capacity Test
Fully discharge batteries. A deep discharge test is
conducted to obtain the battery discharge performance
data.
Stop Test
Stop a shallow discharge test, capacity test, or forced
equalized charging.
Clearing Historical Alarms
You can clear historical alarms successfully only after setting DIP1, DIP2, and DIP3 on the DIP switch
to ON, OFF, and OFF respectively.
Clearing Operation Logs
You can clear operation logs successfully only after setting DIP1, DIP2, and DIP3 on the DIP switch to
OFF, ON, and ON respectively.