UPS5000-E-(360 kVA-480 kVA)
User Manual (40 kVA Power Modules)
3 Installation
Issue 07 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
50
Figure 3-6
Removing the screws that secure the cabinet and pallet
Step 8
Use an electric pallet truck to transport the cabinet near the installation position.
----End
3.1.5 (Optional) Splitting the Power Cabinet and Bypass Cabinet
Context
If the door of the power distribution equipment room is not wide enough to move the UPS,
you can split the power cabinet and bypass cabinet before the movement.
Put away the removed screws and connecting plates to facilitate future cabinet combination.
lists the specifications and number of screws to be removed.
Table 3-6
Specifications for removed screws
Position
Specifications
Quantity (PCS)
Front covers on the
bypass cabinet
M6 panel screw
22