UPS5000-E-(360 kVA-480 kVA)
User Manual (40 kVA Power Modules)
3 Installation
Issue 07 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
59
Figure 3-16
Removing the bottom connecting plates
Step 6
Use a manual pallet truck to transport the power cabinet and bypass cabinet to the installation
position. Ensure that the two cabinets align with each other.
----End
3.1.6 Optional) Combining the Power Cabinet and Bypass
Cabinet
Procedure
Step 1
Install the bottom, middle, and top connecting plates for the power cabinet and bypass
cabinet.
Step 2
Connect the removed copper bars and battery copper bar components based on their numbers.
Step 3
Reconnect the removed cables to the power cabinet system signal interface board, and bind
the cables.
Step 4
Check that the combination of the power cabinet and bypass cabinet is complete and secure.
Step 5
Reinstall the side cover and rear cover.
----End