UPS5000-E-(25 kVA-125 kVA)-FM
User Manual
5 Operations
Issue 06 (2019-12-13)
Copyright © Huawei Technologies Co., Ltd.
199
Figure 5-21
Starting a capacity test
The capacity test automatically stops in any of the following cases:
The battery discharge voltage reaches the end of discharge (EOD) voltage plus 0.01 V.
The load fluctuation exceeds 10%.
An alarm is generated.
When the battery discharge voltage reaches the EOD voltage plus 0.01 V, the test is complete. The test
data is used as capacity test data. Save the capacity test data record with the largest discharge capacity in
a month as the capacity test data for the month. A maximum of recent 36 capacity test records can be
saved.
----End
5.6.4 Test Data Download
5.6.4.1 Download over the LCD
Procedure
Step 1
Insert a USB flash drive into the USB port on the MDU.
Step 2
On the main screen of the LCD, choose
System Info
. Tap
. The
Maintenance
screen is
displayed.
Step 3
Choose
USB Operations
>
Export Logs
, and select a log download path.