UPS5000-S-1200 kVA
User Manual
3 Installation
Issue 04 (2019-06-25)
Copyright © Huawei Technologies Co., Ltd.
88
If the check results of listed items 8 and 9 in
do not meet the acceptance criteria, the
UPS may be damaged.
Table 3-7
Installation checklist
No
.
Item
Acceptance Criteria
01
UPS installation
The UPS is securely installed and does not tilt due to
vibration.
02
Neat arrangement
The UPS and its adjacent cabinets are neatly arranged
and secured with connecting plates.
03
Layout of the busway and
cables
The busway and cables are routed properly as required
by the customer.
04
Labels on the busway and
cables
Both ends of a busway and cable are labeled. Labels are
concise and easy to understand.
05
Cable ties
Cable ties are secured evenly and no burr exists.
06
Cable connections
The input, output, and battery cables are securely
connected. For the cables secured by screws, the spring
washers are flattened.
07
Grounding
The resistance between the UPS ground bar and the
equipment room ground bar is less than 0.1 ohm.
08
AC phase sequence
The mains input, bypass input, and output phase
sequences are correct.
09
Battery cable connections The battery strings are correctly connected to the UPS.
10
Foreign matter cleaning
inside the cabinet
The inside and outside of the cabinet, and other
operating components, are free from conductive dust.
1.
There is no foreign matter (such as copper wires and
screws) on the top of the cabinet.
2.
There is no foreign matter on the copper bar
terminals.
3.
There is no foreign matter around switch terminals.
4.
There is no foreign matter on the bottom plate of the
cabinet.
5.
There is no foreign matter on the rear module
subrack.