UPS5000-S-1600 kVA
User Manual
5 Operations
Issue 04 (2020-03-03)
Copyright © Huawei Technologies Co., Ltd.
172
Figure 5-8
BCB connection setting
Power units 1 and 2 share the dry contact ports on control module 1, and power unit 3 uses the dry
contact ports on control module 2. You need to set BCB box parameters on the LCD of each power unit.
----End
5.1.5 (Optional) Setting Parameters for the Fan Unit
Prerequisites
The fan unit has been configured.
Procedure
Step 1
Choose
System Info > Settings > System Settings
. Set
Top outlet fan
to
Enable
.
Figure 5-9
Setting parameters for the top outlet fan
----End