UPS5000-S-1600 kVA
User Manual
3 Installation
Issue 04 (2020-03-03)
Copyright © Huawei Technologies Co., Ltd.
72
----End
3.2.4 Connecting Cables
Context
Figure 3-33
Copper bar position (rear view of the cabinet)
(1) Battery Input
(2) UPS Output
(3) Main Input
(4) Bypass Input
(5) Battery PE
(6) Equipotential ground point
Table 3-5
Power cable terminal requirements
Port
Description
Connection Method
Bolt
Specifications
Bolt Length
Torque
Mains input
Crimped DT terminals
M12
35 mm
47 N·m
Bypass input
Crimped DT terminals
M12
35 mm
47 N·m
Battery input
Crimped DT terminals
M16
55 mm
120 N·m
Output
Crimped DT terminals
M12
35 mm
47 N·m
PE
Crimped DT terminals
M12
35 mm
47 N·m
Equipotential
ground point
Crimped DT terminals
M6
N/A
4.5 N·m
Procedure
Step 1
Connect the equipotential ground point and the ground bar in the equipment room.
Step 2
Connect the copper bars between the mains input and bypass input (N and PE copper bars).