UPS5000-S-300 kVA User Manual
(3P3W, 200 V)
3 Installation
Issue 01 (2020-03-06)
Copyright © Huawei Technologies Co., Ltd.
58
Figure 3-19
Connecting cables
(1) Signal cables between the
battery grounding failure
detector and the AC current
transformer
(2) Signal cables between
the battery grounding
failure detector and the dry
contact card
(3) Cables between the
battery grounding failure
detector and transformer
(4) Transformer input power
cables
(5) Cable between the
battery grounding failure
detector and fuse
----End
3.2.2.6 Installing the Top Air-flow Cabinet
Procedure
Step 1
Install the Top Air-flow Cabinet.
For the installation method, see
UPS5000-(200 kVA-800 kVA) Top Air-flow Cabinet User
Manual
.
Step 2
Install a transformer.