UPS5000-S-880 kVA
User Manual (CMI)
3 Installation
Issue 02 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
74
Figure 3-30
Connecting the battery cable
Step 10
Route signal cables. Bind cables to the cabinet.
Do not bind signal cables and power cables together.
Figure 3-31
Routing signal cables from the top of the cabinet