Table 5-1 Installation environment checklist
Check Item
Requirement
Compliance
Ventilation and heat
dissipation
Complies with
requirements in
□ Y □ N □ N/A
Stability
□ Y □ N □ N/A
Grounding
□ Y □ N □ N/A
Temperature
Complies with
requirements in
□ Y □ N □ N/A
Relative humidity
□ Y □ N □ N/A
Cleanness
□ Y □ N □ N/A
Electrostatic discharging
Complies with
requirements in
□ Y □ N □ N/A
Surge protection
Complies with
requirements in
.
□ Y □ N □ N/A
Power supply facility
Complies with
requirements in
□ Y □ N □ N/A
Electromagnetic
shielding
Complies with
requirements in
.
□ Y □ N □ N/A
5.2.3 Instruments Required for the Installation
This section describes the instruments and meters for installing the USG.
lists the required instruments and meters for USG installation.
Table 5-2 Required instruments and meters
Category
Instrument/Meter
Measuring and
lineation
instruments
● Ruler: used to measure length.
● Marker: used to indicate specific lengths with drawn
lines.
Fastening tools
● Flat-head screwdriver: used to fasten small screws and
bolts.
● Phillips screwdriver: used to fasten small screws and
bolts.
HUAWEI USG6000E Series
Hardware Guide
5 Hardware Installation
Issue 08 (2022-04-20)
Copyright © Huawei Technologies Co., Ltd.
510