Procedure
Step 1 (Optional) Install a half-height PDU2000.
1. Open the rear door of the cabinet.
2. Secure the half-height PDU2000 to the installation position using screws.
Figure 4-80 Installing a PDU2000 (in the Converged Cabinet with lithium
batteries)
NO TE
The preceding figure shows how to install the PDU2000 inside the Converged Cabinet
where the customer installs their equipment.
FusionModule800 Smart Small Data Center
User Manual
4 Installation Guide
Issue 01 (2021-02-05)
Copyright © Huawei Technologies Co., Ltd.
159