7 System Commissioning
Issue 02 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
42
The panel of the emergency start/abort switch is for one-time use only. Before the
commissioning, remove the panel to operate the emergency start/abort switch directly, as
shown in
Reset the START and STOP buttons after the commissioning (the buttons bounce up).
Figure 7-9
Emergency start/abort switch
The left and right figures respectively show the scenes before and after the panel is removed.
1.
Press
RESET
on the fire alarm control panel to reset the fire alarm control panel.
2.
Set the fire alarm control panel to the AUTO state.
3.
Press the
START
button to trigger a release signal to the fire alarm control panel. The
release countdown starts.
4.
In the countdown period, if you press the
STOP
button, the countdown stops. If you
press the
STOP
button again, the countdown restarts.
5.
After the countdown ends, the fire alarm control panel generates a solenoid valve driver
voltage.
6.
Reset the green
START
button.
Step 10
Simulate a cable disconnection fault for a smoke detector or heat detector.
1.
Press
RESET
on the fire alarm control panel to reset the fire alarm control panel.
2.
Set the fire alarm control panel to the AUTO state.
3.
Hold the body of the smoke or heat detector, and turn the detector body to separate it
from the base.