FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
7 System Commissioning
Issue 02 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
47
Figure 7-17
Removing the safety pin
4.
Reinstall the removed screws and tighten all screws.
----End
7.5 Fire Extinguishing System Commissioning (CE)
Prerequisites
The extinguishant control panel has been powered on.
The management system is working properly.
Before commissioning the fire extinguishing system, remove the electrical actuator from
the container valve of the fire cylinder. This prevents the extinguishant release due to
misoperations, and prevents accidental damage during the commissioning. After the
commissioning of the fire extinguishing system, reinstall the container valve to the
electrical actuator.
To avoid damage to the heat detector, keep a proper distance between the heating device
and the heat detector during the commissioning.
Preparations
Tools: multimeter, smoke pistol, heating device, flat-head screwdriver, Phillips screwdriver,
step ladder