background image

1

NOTICE

Honorable User:
When you first use our instrument, please pay attention to these below:

For it will take a short time of self-checking after power on

please power on

beforehand.

At the beginning

open all needle valves

use flow valves which on the board to

adjust flow. And when test complete

do the two steps conversely.

Do not power off when the instrument at a continuous work

it can work

continuously at least 10 hours by a high-capacity lithium battery.

It may leave some air in the stream tube and gas room after non-use for a long term.

The wet air will influence the test speed

because the sensor brush up against it before

SF6 gas. We’ll find more faster at the second test

3 to 5 minutes

.

Thank you for your cooperation

Summary of Contents for HZSM-701

Page 1: ...0 SF6 Intelligent Accuracy Dew Point Meter Operation Manual ...

Page 2: ...just flow And when test complete do the two steps conversely Do not power off when the instrument at a continuous work it can work continuously at least 10 hours by a high capacity lithium battery It may leave some air in the stream tube and gas room after non use for a long term The wet air will influence the test speed because the sensor brush up against it before SF6 gas We ll find more faster ...

Page 3: ...2 Content 1 Feature and specification 3 2 Instruction of panel 4 3 Operation 5 4 Menu 5 5 Matters need attention 6 ...

Page 4: ...a Legible display dew point Micro moisture ppm ambient temperature ambient humidity time date battery etc can be read from the LCD RS232 port can be connected with serial printer carry on data printing Built in power supply built in 4Ah rechargeable lithium battery it can work continuously at least 10 hours 1 2 Specification dew point Ranges 60 20 Accuracy 1 60 20 Test time 20 3 minutes ambient te...

Page 5: ... of panel 2 1 Front panel CAUTION You can adjust mount angle by pressing the two adjusting buttons on each side 2 2 Back panel 2 3 LCD Dew point Micro moisture Date and time Battery Ambient temperature Ambient humidity ...

Page 6: ... right corner ensure to power off and charge battery when less than 20 3 4 Start Open all needle valves of stream tube use flow valve adjust flow to about 0 5L M then meter the dew point of SF6 The first equipment is tested in 5 10minutes and the next ones needs 3 5minutes 3 5 Save data After test save the data press menu see menu in part4 for details 3 6 Test other equipment When complete one set...

Page 7: ... 3 Delete record In test status press enter to the menu Then press up or down to select delete record press enter will delete all records 4 4 Modify time In test status press enter to the menu Then press up or down to select change date press enter to time page Press up or down to adjust time value press left or right to select hour minute and second Press enter goes to date setting 5 Matters need...

Page 8: ... 7 ...

Reviews: