background image

- 6 -

In test status

press enter to the menu. Then press

up

or

down

to select

save record

”,“

enter

and input serial number for the equipment which is being

tested.

Serial number is up to six-digit

you can change numerical value by

up

or

down

”,

or change digit by

left

or

right

.

Enter

when serial number complete inputting

or press

cancel

to give

up the record and return to menu.

4.2 View record
In test status

press enter to the menu. Then press

up

or

down

to select

view record

”,“

enter

.

LCD display from the latest saved record

press

up

or

down

to view the other

records.

4.3

Delete record

In test status

press enter to the menu. Then press

up

or

down

to select

delete record

”,

press

enter

will delete all records.

4.4

Modify time

In test status

press enter to the menu. Then press

up

or

down

to select

change date

”,

press

enter

to time page.

Press

up

or

down

to adjust time value

press

left

or

right

to select hour

minute and second.

Press

enter

” ,

goes to date setting.

5. Matters need attention

The meter should place at a safe position

avoid fall and strenuous vibration.

Do not meter corrosive gas.

When adjust flow

turn the flow valve slowly, make the flow meter at about

0.5L/M.

Charge battery before use the meter

connect the power line to a 220V

socket

you needn’t power on the meter

it will charge automatically

and

needs more than 20 hours.

Summary of Contents for HZSM-701

Page 1: ...0 SF6 Intelligent Accuracy Dew Point Meter Operation Manual ...

Page 2: ...just flow And when test complete do the two steps conversely Do not power off when the instrument at a continuous work it can work continuously at least 10 hours by a high capacity lithium battery It may leave some air in the stream tube and gas room after non use for a long term The wet air will influence the test speed because the sensor brush up against it before SF6 gas We ll find more faster ...

Page 3: ...2 Content 1 Feature and specification 3 2 Instruction of panel 4 3 Operation 5 4 Menu 5 5 Matters need attention 6 ...

Page 4: ...a Legible display dew point Micro moisture ppm ambient temperature ambient humidity time date battery etc can be read from the LCD RS232 port can be connected with serial printer carry on data printing Built in power supply built in 4Ah rechargeable lithium battery it can work continuously at least 10 hours 1 2 Specification dew point Ranges 60 20 Accuracy 1 60 20 Test time 20 3 minutes ambient te...

Page 5: ... of panel 2 1 Front panel CAUTION You can adjust mount angle by pressing the two adjusting buttons on each side 2 2 Back panel 2 3 LCD Dew point Micro moisture Date and time Battery Ambient temperature Ambient humidity ...

Page 6: ... right corner ensure to power off and charge battery when less than 20 3 4 Start Open all needle valves of stream tube use flow valve adjust flow to about 0 5L M then meter the dew point of SF6 The first equipment is tested in 5 10minutes and the next ones needs 3 5minutes 3 5 Save data After test save the data press menu see menu in part4 for details 3 6 Test other equipment When complete one set...

Page 7: ... 3 Delete record In test status press enter to the menu Then press up or down to select delete record press enter will delete all records 4 4 Modify time In test status press enter to the menu Then press up or down to select change date press enter to time page Press up or down to adjust time value press left or right to select hour minute and second Press enter goes to date setting 5 Matters need...

Page 8: ... 7 ...

Reviews: