3
INSTALLATION INSTRUCTIONS
INITIAL FIXTURE ASSEMBLY:
1. Align holes in Yoke to holes on side of heatsink (2 places). (See Figure 1)
2. Secure Yoke to heatsink with (2) ¼-20 screws and (2) star washers. (See Figure 2)
3. Route wiring into electrical box on heatsink and fasten electrical connections.
a) For LX/LXHE models, fasten the connector to its mating half.
Connectors can only be assembled one way. (See Figure 3a)
b) For MM/MMHE/MH/MHHE models, fasten the two connectors to
their mating half. Connectors can only be assembly one way. (See Figure 3b)
4. Place connectors inside electrical box and fasten the cover to the heatsink using (2) 8-32 screws. The wiring should route
through the bushing in the cover. The Yoke will need to be rotated to each side to access the screw heads. (See Figure 1) .
5. Fasten (2) 8‐32 screws through the yoke and into the heatsink to lock the rotation of the heatsink. (See Figure 2)
UTB2
INSTALLATION INSTRUCTIONS
Hubbell Lighting, Inc. Doc. No. 93097040
A subsidiary of Hubbell Incorporated Revision P0
701 Millennium Drive • Greenville, SC 29607 Page 3 Phone (864) 678-1000
INITIAL FIXTURE ASSEMBLY:
1.
Align holes in Yoke to holes on side of heatsink (2 places). (See Figure 1)
2.
Secure Yoke to heatsink with (2) 1/4‐20 screws and (2) star washers.
(See Figure 2)
3.
Route wiring into electrical box on heatsink and fasten electrical
connections.
a)
For LX/LXHE models, fasten the connector to its mating half.
Connectors can only be assembled one way. (See Figure 3a)
b)
For MM/MMHE/MH/MHHE models, fasten the two connectors to
their mating half. Connectors can only be assembly one way. (See
Figure 3b)
4.
Place connectors inside electrical box and fasten the cover to the
heatsink using (2) 8‐32 screws. The wiring should route through the
bushing in the cover. The Yoke will need to be rotated to each side to
access the screw heads. (See Figure 1) .
5.
Fasten (2) 8‐32 screws through the yoke and into the heatsink to lock the
rotation of the heatsink. (See Figure 2)
FIGURE 2
YOKE HARDWARE
FIGURE 1
YOKE TO HEATSINK ASSEMBLY
FIGURE 3a
LX / LXHE CONNECTOR
FIGURE 3b
MM / MMHE / MH / MMHE CONNECTORS
DUAL INPUT SIDE
FOR BOARD WIRES
SINGLE INPUT SIDE
FOR DRIVER WIRES
UTB2
INSTALLATION INSTRUCTIONS
Hubbell Lighting, Inc. Doc. No. 93097040
A subsidiary of Hubbell Incorporated Revision P0
701 Millennium Drive • Greenville, SC 29607 Page 3 Phone (864) 678-1000
INITIAL FIXTURE ASSEMBLY:
1.
Align holes in Yoke to holes on side of heatsink (2 places). (See Figure 1)
2.
Secure Yoke to heatsink with (2) 1/4‐20 screws and (2) star washers.
(See Figure 2)
3.
Route wiring into electrical box on heatsink and fasten electrical
connections.
a)
For LX/LXHE models, fasten the connector to its mating half.
Connectors can only be assembled one way. (See Figure 3a)
b)
For MM/MMHE/MH/MHHE models, fasten the two connectors to
their mating half. Connectors can only be assembly one way. (See
Figure 3b)
4.
Place connectors inside electrical box and fasten the cover to the
heatsink using (2) 8‐32 screws. The wiring should route through the
bushing in the cover. The Yoke will need to be rotated to each side to
access the screw heads. (See Figure 1) .
5.
Fasten (2) 8‐32 screws through the yoke and into the heatsink to lock the
rotation of the heatsink. (See Figure 2)
FIGURE 2
YOKE HARDWARE
FIGURE 1
YOKE TO HEATSINK ASSEMBLY
FIGURE 3a
LX / LXHE CONNECTOR
FIGURE 3b
MM / MMHE / MH / MMHE CONNECTORS
DUAL INPUT SIDE
FOR BOARD WIRES
SINGLE INPUT SIDE
FOR DRIVER WIRES
UTB2
INSTALLATION INSTRUCTIONS
Hubbell Lighting, Inc. Doc. No. 93097040
A subsidiary of Hubbell Incorporated Revision P0
701 Millennium Drive • Greenville, SC 29607 Page 3 Phone (864) 678-1000
INITIAL FIXTURE ASSEMBLY:
1.
Align holes in Yoke to holes on side of heatsink (2 places). (See Figure 1)
2.
Secure Yoke to heatsink with (2) 1/4‐20 screws and (2) star washers.
(See Figure 2)
3.
Route wiring into electrical box on heatsink and fasten electrical
connections.
a)
For LX/LXHE models, fasten the connector to its mating half.
Connectors can only be assembled one way. (See Figure 3a)
b)
For MM/MMHE/MH/MHHE models, fasten the two connectors to
their mating half. Connectors can only be assembly one way. (See
Figure 3b)
4.
Place connectors inside electrical box and fasten the cover to the
heatsink using (2) 8‐32 screws. The wiring should route through the
bushing in the cover. The Yoke will need to be rotated to each side to
access the screw heads. (See Figure 1) .
5.
Fasten (2) 8‐32 screws through the yoke and into the heatsink to lock the
rotation of the heatsink. (See Figure 2)
FIGURE 2
YOKE HARDWARE
FIGURE 1
YOKE TO HEATSINK ASSEMBLY
FIGURE 3a
LX / LXHE CONNECTOR
FIGURE 3b
MM / MMHE / MH / MMHE CONNECTORS
DUAL INPUT SIDE
FOR BOARD WIRES
SINGLE INPUT SIDE
FOR DRIVER WIRES