FIGURE 5A

HOOK LOOP ASSEMBLY

FIGURE 5B

HOOK LOOP ASSEMBLY

GENERAL INFORMATION

 

All 12” (304.8 mm) minimum supply wire outside of conduit. 

 

Fixture mounting hook loop threads are 3/4‐14 NPS. 

 

HOOK/LOOP MOUNTING: (Figures 5A, 5B & 5C) 

 

Cord & Hook/Loop ordered as CxHLPx  (Plug optional) 

1.

 

If not already done, assemble the hook loop pieces according to the following steps. 

2.

 

Thread the upper locknut (with flat surface down) onto the hook loop to approximately 1/8” 

from the top of the threads. (Figure 5A) 

3.

 

Position the safety clasp as shown and just start the fastener, but leave loose. (Figure 5A) 

4.

 

Insert the power cord, must be rated minimum 90°C 16/3 SEOW‐A or equivalent, through the 

hole in the hook and insert gotcha ring, top washer, gasket, lower washer and cast 

bushing/nut onto cord. Fully tighten cast bushing against bottom of hook. (Figure 5A) 

5.

 

Slide the assembly into the slot on the fixture yoke, so that the upper locknut is on top and 

the tightened cast bushing is on the bottom and hand tighten the upper locknut. (Figure 5B) 

6.

 

After the wiring is connected on the inside of the fixture, close the housing door such that 

the tab on the cover fits under the top exposed locknut on the hook loop. (Figure 5C) 

7.

 

Once fixture is fastened closed, tighten the upper locknut with a pair of pliers. 

CAUTION: DO NOT TIGHTEN THE HOOK BY USING A SCREWDRIVER BLADE ‐ TOO MUCH 

FORCE COULD BREAK THE HOOK. (Figure 5C) 

 

HOOK

LOOP

UPPER

LOCKNUT

WASHER

SAFETY

CLASP

FASTENER

SAFETY

CLASP

FIGURE 5C

HOOK LOOP ASSEMBLY

GOTCHA

RING

OPTIONAL

PLUG SHOWN

GASKET

WASHER

CAST NUT

UTB2

INSTALLATION INSTRUCTIONS

Hubbell Lighting, Inc.                                                                                                                           Doc. No. 93097040

A subsidiary of Hubbell Incorporated                                                                                                            Revision P0

701 Millennium Drive • Greenville, SC  29607          Page 5                                                          Phone (864) 678-1000

FIGURE 5A

HOOK LOOP ASSEMBLY

FIGURE 5B

HOOK LOOP ASSEMBLY

GENERAL INFORMATION

 

All 12” (304.8 mm) minimum supply wire outside of conduit. 

 

Fixture mounting hook loop threads are 3/4‐14 NPS. 

 

HOOK/LOOP MOUNTING: (Figures 5A, 5B & 5C) 

 

Cord & Hook/Loop ordered as CxHLPx  (Plug optional) 

1.

 

If not already done, assemble the hook loop pieces according to the following steps. 

2.

 

Thread the upper locknut (with flat surface down) onto the hook loop to approximately 1/8” 

from the top of the threads. (Figure 5A) 

3.

 

Position the safety clasp as shown and just start the fastener, but leave loose. (Figure 5A) 

4.

 

Insert the power cord, must be rated minimum 90°C 16/3 SEOW‐A or equivalent, through the 

hole in the hook and insert gotcha ring, top washer, gasket, lower washer and cast 

bushing/nut onto cord. Fully tighten cast bushing against bottom of hook. (Figure 5A) 

5.

 

Slide the assembly into the slot on the fixture yoke, so that the upper locknut is on top and 

the tightened cast bushing is on the bottom and hand tighten the upper locknut. (Figure 5B) 

6.

 

After the wiring is connected on the inside of the fixture, close the housing door such that 

the tab on the cover fits under the top exposed locknut on the hook loop. (Figure 5C) 

7.

 

Once fixture is fastened closed, tighten the upper locknut with a pair of pliers. 

CAUTION: DO NOT TIGHTEN THE HOOK BY USING A SCREWDRIVER BLADE ‐ TOO MUCH 

FORCE COULD BREAK THE HOOK. (Figure 5C) 

 

HOOK

LOOP

UPPER

LOCKNUT

WASHER

SAFETY

CLASP

FASTENER

SAFETY

CLASP

FIGURE 5C

HOOK LOOP ASSEMBLY

GOTCHA

RING

OPTIONAL

PLUG SHOWN

GASKET

WASHER

CAST NUT

UTB2

INSTALLATION INSTRUCTIONS

Hubbell Lighting, Inc.                                                                                                                           Doc. No. 93097040

A subsidiary of Hubbell Incorporated                                                                                                            Revision P0

701 Millennium Drive • Greenville, SC  29607          Page 5                                                          Phone (864) 678-1000

FIGURE 5A

HOOK LOOP ASSEMBLY

FIGURE 5B

HOOK LOOP ASSEMBLY

GENERAL INFORMATION

 

All 12” (304.8 mm) minimum supply wire outside of conduit. 

 

Fixture mounting hook loop threads are 3/4‐14 NPS. 

 

HOOK/LOOP MOUNTING: (Figures 5A, 5B & 5C) 

 

Cord & Hook/Loop ordered as CxHLPx  (Plug optional) 

1.

 

If not already done, assemble the hook loop pieces according to the following steps. 

2.

 

Thread the upper locknut (with flat surface down) onto the hook loop to approximately 1/8” 

from the top of the threads. (Figure 5A) 

3.

 

Position the safety clasp as shown and just start the fastener, but leave loose. (Figure 5A) 

4.

 

Insert the power cord, must be rated minimum 90°C 16/3 SEOW‐A or equivalent, through the 

hole in the hook and insert gotcha ring, top washer, gasket, lower washer and cast 

bushing/nut onto cord. Fully tighten cast bushing against bottom of hook. (Figure 5A) 

5.

 

Slide the assembly into the slot on the fixture yoke, so that the upper locknut is on top and 

the tightened cast bushing is on the bottom and hand tighten the upper locknut. (Figure 5B) 

6.

 

After the wiring is connected on the inside of the fixture, close the housing door such that 

the tab on the cover fits under the top exposed locknut on the hook loop. (Figure 5C) 

7.

 

Once fixture is fastened closed, tighten the upper locknut with a pair of pliers. 

CAUTION: DO NOT TIGHTEN THE HOOK BY USING A SCREWDRIVER BLADE ‐ TOO MUCH 

FORCE COULD BREAK THE HOOK. (Figure 5C) 

 

HOOK

LOOP

UPPER

LOCKNUT

WASHER

SAFETY

CLASP

FASTENER

SAFETY

CLASP

FIGURE 5C

HOOK LOOP ASSEMBLY

GOTCHA

RING

OPTIONAL

PLUG SHOWN

GASKET

WASHER

CAST NUT

6.  After the wiring is connected on the inside of the fixture, close 

the housing door such that the tab on the cover fits under the top 
exposed locknut on the hook loop. (Figure 5C)

7.  Once fixture is fastened closed, tighten the upper locknut with a 

pair of pliers. 
CAUTION: DO NOT TIGHTEN THE HOOK BY USING A SCREWDRIVER 
BLADE; TOO MUCH FORCE COULD BREAK THE HOOK. (Figure 5C)

UTB2

INSTALLATION INSTRUCTIONS

Hubbell Lighting, Inc.                                                                                                                           Doc. No. 93097040

A subsidiary of Hubbell Incorporated                                                                                                            Revision P0

701 Millennium Drive • Greenville, SC  29607          Page 5                                                          Phone (864) 678-1000

FIGURE 5A

HOOK LOOP ASSEMBLY

FIGURE 5B

HOOK LOOP ASSEMBLY

GENERAL INFORMATION

 

All 12” (304.8 mm) minimum supply wire outside of conduit. 

 

Fixture mounting hook loop threads are 3/4‐14 NPS. 

 

HOOK/LOOP MOUNTING: (Figures 5A, 5B & 5C) 

 

Cord & Hook/Loop ordered as CxHLPx  (Plug optional) 

1.

 

If not already done, assemble the hook loop pieces according to the following steps. 

2.

 

Thread the upper locknut (with flat surface down) onto the hook loop to approximately 1/8” 

from the top of the threads. (Figure 5A) 

3.

 

Position the safety clasp as shown and just start the fastener, but leave loose. (Figure 5A) 

4.

 

Insert the power cord, must be rated minimum 90°C 16/3 SEOW‐A or equivalent, through the 

hole in the hook and insert gotcha ring, top washer, gasket, lower washer and cast 

bushing/nut onto cord. Fully tighten cast bushing against bottom of hook. (Figure 5A) 

5.

 

Slide the assembly into the slot on the fixture yoke, so that the upper locknut is on top and 

the tightened cast bushing is on the bottom and hand tighten the upper locknut. (Figure 5B) 

6.

 

After the wiring is connected on the inside of the fixture, close the housing door such that 

the tab on the cover fits under the top exposed locknut on the hook loop. (Figure 5C) 

7.

 

Once fixture is fastened closed, tighten the upper locknut with a pair of pliers. 

CAUTION: DO NOT TIGHTEN THE HOOK BY USING A SCREWDRIVER BLADE ‐ TOO MUCH 

FORCE COULD BREAK THE HOOK. (Figure 5C) 

 

HOOK

LOOP

UPPER

LOCKNUT

WASHER

SAFETY

CLASP

FASTENER

SAFETY

CLASP

FIGURE 5C

HOOK LOOP ASSEMBLY

GOTCHA

RING

OPTIONAL

PLUG SHOWN

GASKET

WASHER

CAST NUT

OPTICS WIRE GUARD INSTALLATION (If Optioned):

1.  With mounting screws removed from heatsink, install full wire guard (WG-16) onto Reflector.
2.  Install Reflector onto fixture heatsink using screws (4x) provided.

Summary of Contents for Utilibay UTB2

Page 1: ...bserve all precautions usually followed when dealing with high voltage equipment when installing or servicing this light fixture The product must be installed in accordance with the applicable install...

Page 2: ...NG FIXTURE RECEIVING For shipping purposes the fixture will come in multiple boxes The upper assembly will be packaged separately from the reflector assembly and the lens assembly See instructions on...

Page 3: ...diary of Hubbell Incorporated Revision P0 701 Millennium Drive Greenville SC 29607 Page 3 Phone 864 678 1000 INITIAL FIXTURE ASSEMBLY 1 Align holes in Yoke to holes on side of heatsink 2 places See Fi...

Page 4: ...screws fasten the reflector to the heatsink FIGURE 3B FIGURE 3A LENS MOUNTING FIGURE 3B LENS INSTALLATION If Optioned See Figure 3B 1 Once the reflector has been mounted to the upper assembly then th...

Page 5: ...es according to the following steps 2 Thread the upper locknut with flat surface down onto the hook loop to approximately 1 8 from the top of the threads Figure 5A 3 Position the safety clasp as shown...

Page 6: ...removed from heatsink install full wire guard WG 16 onto Reflector 2 Install Reflector onto fixture heatsink using screws 4x provided LENS WIRE GUARD INSTALLATION If Optioned 1 With the screws removed...

Page 7: ...ntil sensor box is secure See Fig 7B 2 Screw the sensor lens onto the threaded shaft until secure See Fig 7C FIGURE 7A WIRE GUARD ASSEMBLY W OCCUPANCY SENSOR OPTION SCL SCD SCL SCD SENSOR BRKT RING AS...

Reviews: