INSTALLATION MANUAL
IANOS EDR (Equipment Distribution Rack) chassis
Page 10 of 15
INST WIRING MODULES (FROM THE REAR)
Step 74
Step 75
Step 76
Step 77
Step 78
REMOVING MODULES (FROM THE REAR)
Step 79
Step 80
This document is downloaded via www.farbin.ir as an authorized distributer in IRAN.