INSTALLATION MANUAL
IANOS EDR (Equipment Distribution Rack) chassis
Page 14 of 15
APPLICATION: ALL CABLES FROM THE SAME SIDE (OPTIONAL)
Step 105
Step 106
Step 107
Step 108
Step 109
ATTENTION: Click in clip
Step 110
Step 111
Step 112
Step 113
APPLICATION: PART LOADED CHASSIS (USE OF OPTIONAL MODULE BLANKS)
Step 114
Step 115
Step 116
This document is downloaded via www.farbin.ir as an authorized distributer in IRAN.