INSTALLATION MANUAL
MASTERLINE Ultimate Hybrid High Voltage 4/12
(MLUH HV 4/12) blunt cut at BTS side
Page 11 of 12
HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and
accessories other than the ones recommended in the latest revision of this installation manual. Any installation performed by unqualified personnel
voids the product warranty provided by HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these
products. For advice concerning the general handling of these products please contact HUBER+SUHNER.
FIBRE OPTIC ALLOCATION
POWER CODING