background image

INSTALLATION MANUAL 

MASTERLINE Ultimate Micro 

Page 3 of 4 

HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and 

accessories other than the ones recommended herein. Any installation performed by unqualified personnel  voids the product warranty provided by 

HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the gen-

eral handling of these products please contact HUBER+SUHNER. 

Step 3: 

 

The fiber optic cable must be secured accord-
ing to national and local regulations. The 
weight of the cable must be supported by the 
cable fasteners.  

 

 

Step 4: 

 

In the case of a daisy chain installation, all the 
MLUM systems must be fastened in accord-
ance with steps 1 and 2. 

 

 

Step 5: 

 

Once all the MLUM systems have been fas-
tened in accordance with the national and re-
gional regulations, they can be connected to-
gether with jumper cables. 
Remove the protective cap before plugging in 
and turn the connector to the correct position 
without applying pressure. Then engage the 
connector by pressing. Turn it gently in the op-
posite direction to check that the connector is 
properly engaged.  

 

 

 
 
 
 
 
 

Summary of Contents for MASTERLINE Ultimate Micro

Page 1: ...s HUBER SUHNER declines all liability and claims if the specifications are not met NOTES IN THIS MANUAL The following symbols are used in this manual Info notes Info notes contain important instructions for installation and proper use of the product throughout its life cycle The info notes also indicate that non compliance may result in material damage or financial loss Notes about hazards and saf...

Page 2: ...Micro MLUM may only be lifted up as marked in red Make sure that the pull rope does not slip out of the bracket during pulling and that the pull rope has enough pulling force to safely lift the MLUM system Avoid buckling the cable or bending it at less than the minimum radius while the device is being raised All plug type cables must be unplugged prior to raising Step 2 Fixing Mast and wall mounti...

Page 3: ... please contact HUBER SUHNER Step 3 The fiber optic cable must be secured accord ing to national and local regulations The weight of the cable must be supported by the cable fasteners Step 4 In the case of a daisy chain installation all the MLUM systems must be fastened in accord ance with steps 1 and 2 Step 5 Once all the MLUM systems have been fas tened in accordance with the national and re gio...

Page 4: ...in the user manual for guidance on handling cables and laying multi connector cables Step 7 All jumper cables must be secured according to national and local regulations The weight of the cable must be supported by the cable fas teners Step 8 Once all the jumper cables have been con nected the main feed can be connected to the base station or another signal source The protective tube must be remov...

Reviews: