©
2011 by Huchez Treuils S.A.S.
Translation of the original instructions manual
11
UK
Reproduction prohibited
The user must tauten the rope using a minimum force of 1% of the operating load of the
winch.
The service life of the steel ropes used on the winch depends on a number of factors, including
the form of the work cycles (lifting height, lifting speed, number and type of deviations, etc.)
and the operating mode (number of coil layers, distribution of the work cycles over the length
of the steel rope, etc.). The service life of steel ropes is therefore subject to considerable
variation depending on these factors.
Please remember that rope must be replaced with equipment which meets the same
specifications as the original rope.
This replacement must be recorded in the maintenance booklet.
IMPORTANT
: even if the rope was supplied with the winch, it was not tautened during
assembly. The user must tauten it using a minimum force of 1% of its breaking load.
Measuring the rope diameter using sleeve callipers:
Correct measurement
Incorrect measurement
Handling steel ropes
Always use suitable protective gloves when handling steel ropes
Never use a rope with faults such as:
An unacceptable number of broken strands
Basket distortions
Broken bird-caging
Flattening
Constrictions
Strand extrusions
Broken rope cores
Slack strands
Bends or loops
Always check the level of wear of the rope before use
Never use steel ropes as loops
Never expose steel ropes to angular or sharp edges
Unwinding the rope from its reel:
CORRECT :
INCORRECT