Place hands or clothes, etc. in contact with moving parts, in particular the areas where the rope 
is wound in/out. 

 
 

3 - Warranty 

Our electric winches are guaranteed for 2 years from the date of shipment (ex-works). 
The seller undertakes to repair any operating fault resulting from a fault in the design, execution, 
components or materials themselves. 
 
The warranty does not cover wear and tear or damage resulting from a lack of regular or periodic 
maintenance. It does not cover damage resulting from a lack of supervision, incorrect handling or 
an  incorrect  use  of  the  machines,  in  particular  overloading,  pulling  at  an  angle,  under  or 
overvoltage or incorrect connection. 
 
The  warranty  does  not  apply  to  any  disassembly,  modification  or  replacement  of  mechanical  or 
electrical parts undertaken without our agreement or by a non-approved operator. The warranty 
only applies to the manufacturer's original spare parts. During the warranty period, the seller must 
replace  or  repair  any  parts  recognised  as  faulty  after  inspection  by  the  qualified  and  approved 
department, all free of charge. 
 
The warranty excludes all other services or compensation. 
 
Repairs  undertaken  within  the  framework  of  the  warranty  are,  in  principle,  performed  in  the 
seller's workshops or the workshop of a representative approved by the manufacturer. When work 
is carried out on the equipment outside of their workshops, the seller must cover the labour costs 
related  to  the  disassembly  or  reassembly  of  these  parts  if  these  operations  are  performed 
exclusively  by  their  personnel  or  a  representative  approved  by  the  manufacturer.  The  parts 
replaced become the property of the seller and must be returned to them at their own expense. 
 
In  the  case  of  components  with  a  particular  relative  importance  not  manufactured  by  the  seller 
themselves and which bear the brand of a specialist manufacturer, the warranty, which may vary 
according to the manufacturer, is the same as that agreed by this manufacturer. 

 

 

4 – Acceptance of the equipment 

Conduct a visual inspection of the packaging to ensure that it is in good condition. 

In the event of an anomaly, issue the usual reserves. 
Check that the winch corresponds to your order 
 
 

5 –Obligatory regulatory checks by the user 

 

 

This equipment has been designed to be tested: 

 

 

In a dynamic situation, with coefficient 1.1 

 

In a static situation, with coefficient 1.25 

 

The users are required to comply with the standards in force in their country. 

 

With regard to France: 

 

Order of 1

st

 March 2004 relating to the verification of lifting machines and accessories: 

 

The  modifications  to  the  regulation  relating  to  the  use  and  verification  of  lifting  machines  and 

accessories, which came into effect on 1st April 2005, impose new obligations on all users: 

 

 

The suitability inspection that involves checking that the lifting machine is suitable for the work 

that the user intends to carry out, as well as for the risks to which workers are exposed, and 

that the intended operations are compatible with the conditions of use for the machine defined 

by the manufacturer. 

 

The  assembly  and  installation  inspection  that  involves  ensuring  that  the  lifting  machine  is 

assembled and installed in a safe way in accordance with the manufacturer's instruction manual, 

Summary of Contents for PRIMO INOX BT 1000

Page 1: ... 2011 by Huchez Treuils S A S Stainless steel electric winch Stainless steel electric winches PRIMOINOXfrom250to1000kg Instruction manual ______________________ UK 245 120 18 1 ...

Page 2: ...he reliability and service life of the winch The instruction manual must always be available in the place where the winch is being used In addition to the set up instructions and regulations concerning the prevention of accidents the work safety and professional regulations in force in each country must also be respected This equipment is governed by European regulations and more specifically Dire...

Page 3: ...truction manual Failure to comply with these instructions increases the level of risk Only the people designated by the company are authorised to operate the winch Before using the winch for the first time familiarise yourself with its conditions of use To this end read the present instruction manual carefully and in its entirety and perform all the operations described herein one after the other ...

Page 4: ... these parts if these operations are performed exclusively by their personnel or a representative approved by the manufacturer The parts replaced become the property of the seller and must be returned to them at their own expense In the case of components with a particular relative importance not manufactured by the seller themselves and which bear the brand of a specialist manufacturer the warran...

Page 5: ...the frequency If the operations involve the replacement of certain components of the machine the references of these components are indicated The English version of the maintenance booklet for our lifting winches can be downloaded from our website www huchez fr uk under the heading After sales services A copy is however proposed in the annexes of this manual The inspections must be carried out in ...

Page 6: ...the original instructions manual 6UK Reproduction prohibited Models PRIMO INOX BT 250 400 PRIMO INOX BT 1000 A mm 476 580 B mm 528 615 C mm 244 326 ØD mm 85 140 E mm 250 260 F mm 214 280 ØG mm 9 17 J mm 10 30 M mm 117 170 N mm 113 171 T mm 257 280 ...

Page 7: ...pe kg 40 40 40 40 90 90 Important the diameter of the rope indicated above corresponds to the rope recommended in the FEM 1 Bm ISO M3 classification It also corresponds to the capacity on the last layer Important it is obligatory to check that the rope resistance coefficient complies with the load lifted FEM 1 Bm ISO M3 6 4 Options These winches can be supplied optionally with Rope press roller Gr...

Page 8: ... rated capacity t operating time with payload or partial load dead load total operating time Y dead load maximum capacity t Δ operating time with dead load only total operating time FEM classification Usage rate PRIMO INOX 250 400 1000 Average operating time per day in hours 15 30 1 h 2 h Light 1Dm 1Dm 1Cm 1Bm Medium 1Dm 1Cm 1Bm 1Am Heavy 1Cm 1Bm 1Am 2m Very heavy 1Bm 1Am 2m 3m 7 Handling Storage ...

Page 9: ...direction of the arrows indicated on the control unit Check that the brake works with a nominal load attached lift the load and lower it again or in the case of pulling pull this load Check that the limit switch works The winch has been subjected to dynamic and static tests in the factory cf Test record 8 2 Place of installation These winches must be installed and bolted to a flat solid and secure...

Page 10: ...ording to the models 1000 kg Never shunt the disconnecting switches electrical switches prevention or limitation equipment Never block adjust or remove switches or end stops in order to go beyond the levels that they allow A disconnecting switch must be placed no more than 10 metres from the place of use Recommended rope section VOLTAGE TENSION TYPE Length of supply rope 10 m 30 m 230 V single pha...

Page 11: ...ipment which meets the same specifications as the original rope This replacement must be recorded in the maintenance booklet IMPORTANT even if the rope was supplied with the winch it was not tautened during assembly The user must tauten it using a minimum force of 1 of its breaking load Measuring the rope diameter using sleeve callipers Correct measurement Incorrect measurement Handling steel rope...

Page 12: ...on Take a mallet or a block of wood and knock the turns against one another not too hard to prevent the strands from overlapping one another but tightly enough to prevent the rope from moving on the drum If the first layer is wound too loose the next layer will form a space in the first layer that will result in an open area If the first layer is too tight the subsequent layers will not have enoug...

Page 13: ... of cable winding according to the motor connection Right hand rope Wind from the left towards the right Right hand rope Wind from the right towards the left Left hand rope Wind from the right towards the left Left hand rope Wind from the left towards the right Reeving principle Smooth drum 1 5 max Grooved drum 2 max D 20 x L ...

Page 14: ... grease The reducer is lubricated using RENOLIT CXI 2 fabricant FUCHS Very important In the event of a change in the type of grease contact our after sales service Winches Remove the bulk of the dirt from the winch Always store the winch in a dry place Ropes The ropes must be cleaned and greased regularly using a special grease which penetrates to the rope core Only use appropriate and harmless cl...

Page 15: ...e friction surface at the bottom of the motor On stopping the motor the magnetic field disappears The central spring closes the brake again by bringing the conical panel back into contact with the motor s rear flange 10 Taking out of use If the equipment is in a state of disrepair likely to give rise to risks the user is obliged to ensure that this equipment is eliminated i e prevented from operat...

Page 16: ... missing Check the power supply Circuit breaker activated instantly Short circuit in the power supply cables Eliminate the short circuit Short circuit in the motor Have the fault corrected in an approved workshop Power supply cables incorrectly connected Correct the connection Motor earth fault Have the fault corrected in an approved workshop Speed greatly reduced when loaded Voltage drop Increase...

Page 17: ... 2011 by Huchez Treuils S A S Translation of the original instructions manual17UK Reproduction prohibited 13 Declaration of EC conformity ...

Page 18: ...OX 400 kg p 23 PRIMO INOX 1000 kg p 25 C Electrical diagrams Important the following diagrams correspond to a standard installation of our standard models If the winch is adapted to a specific use a specific electrical diagram is required do not hesitate to contact us to obtain this PRIMO INOX in low voltage control single phase p 32 PRIMO INOX in low voltage control three phase p 34 D Limit switc...

Page 19: ...nd 1000 kg PRIMO INOX 250 400 PRIMO INOX 1000 No Qty Part no Qty Part no Description 1 1 24696 1 24697 Limit switch 2 2 13124 2 13694 Limit switch fixing screw 3 4 13208 Washer 4 2 13351 Brake nut 5 1 24694 1 24694 Oldham disk 6 1 24690 1 24762 Limit switch end 7 4 13614I 3 13058 Support fixing screw 8 1 24673 1 24755 Limit switch support 1000 250 400 ...

Page 20: ...NLESS STEEL 8 3 13688 13688 13688 13688 Screw TBHC M8x16 9 1 23777 23777 23777 23777 Neoprene joint Ø4 10 1 24650 24650 24650 24650 Welded reducing flange 11 1 24654 24654 24654 24654 Welded outer flange 12 1 24657 24657 24657 24657 Transmission casing 13 1 24658 24658 24658 24658 Sub unit drum 14 3 24664 24664 24664 24664 Tie Rod 15 1 24665 24665 24665 24665 Drum bearing housing 16 1 24666 24666 ...

Page 21: ...iginal instructions manual21UK Reproduction prohibited PRIMO INOX 1000 kg Part references THE SERIAL NUMBERMUSTBESPECIFIED FOR ALLSPARE PARTORDERS PRIMO INOX 1001 BT No Qty Part no Description No Qty Part no Description Not communicated Not communicated ...

Page 22: ... 2011 by Huchez Treuils S A S Translation of the original instructions manual22UK Reproduction prohibited C ELECTRICAL DIAGRAMS Wiring diagram for the single phase low voltage control PRIMO INOX ...

Page 23: ... 2011 by Huchez Treuils S A S Translation of the original instructions manual23UK Reproduction prohibited Wiring diagram for the three phase low voltage control PRIMO INOX ...

Page 24: ...ore doing anything turn off the main power supply to the winch To set the cams properly loosen the central screw of the group of cams Then set the trigger point for each cam using their adjustment screws The screws are numbered to indicate the cams in increasing order from the bottom of the group to the top Retighten the central screw ...

Page 25: ... the original instructions manual25UK Reproduction prohibited E MAINTENANCE BOOKLET The English version of the maintenance booklet for our lifting winches can be downloaded from our website www huchez fr uk under the heading After sales services ...

Page 26: ... 2011 by Huchez Treuils S A S Translation of the original instructions manual26UK Reproduction prohibited ...

Reviews: