7
ASSEMBLING AND INSTALLING THE SET-UP STANDS
When you are measuring and adjusting track-width, camber & camber rise, caster,
toe, steering throw symmetry, and tweak, you will need to assemble and install the
set-up stands.
When you are measuring downstops and ride height, you do not need to use the set-up
stands.
ASSEMBLING THE SET-UP STANDS
The set-up stands of the Exclusive Alu. Set-Up System For All 1/8 Off-road Cars &
Truggies must be assembled in order for you to use them. These stands were designed
for quick and easy “one screw” assembly and disassembly
The set-up stands consist of the
following pieces:
•
alloy side plates front (2)
•
alloy side plates rear (2)
•
alloy camber gauges (4)
•
acrylic toe gauge (1)
➊
Attach a camber gauge to a side plate
using a screw through the ball-bearing at
the top of the camber gauge.
➋
Using a 2.0mm Allen wrench, tighten
the screw until snug.
➌
Make sure the stand operates freely
without binding.