HUGH CRANE (Cleaning Equipment) Ltd
–
COMMANDO
®
1000 Range BARROW UNIT
J\Engineering\Manuals\COMMANDO MANUALS UPDATE2017Manual Commando 1000Range_Update2017
- 18 -
8.
MAINTENANCE & ADJUSTMENT.
8.1 REGULAR MAINTENANCE SCHEDULE
Note that the machine should be shut down before carrying out the following:
Daily
Weekly
250
hrs.
500
hrs.
1000
hrs.
ENGINE:
Oil level
*
Air Cleaner oil bath
*
*
Fan belt
*
Oil Change
*
Oil filter change
*
Check & adjust valve
clearances
*
Battery level
*
Clean Air Duct
*
Check Battery Terminals
*
Check tightness of all
screws
*
Renew fuel filter
*
Clean & Check
mountings
*
GEARBOX
Check Level
*
Change oil
*
PUMP
Inlet filter
*
Oil level
*
Change oil
*
Hose Reel security
*
Hoses for
security/chafing
*
UNLOADER
VALVE
Check break off pressure
*
HOSES
Hoses of the correct
rating and undamaged
*