DUSTGUARD Page 12 of 13
12
8.4 LOCATING & STARTING THE UNIT
Starting up of the machine and spray should be carried out in the following
sequence:
•
With the engine stopped, locate the machine in the required position on site.
•
Ensure the valve controlling the HP water to the spray unit is OFF; the oscillation is
OFF; and the oscillation stroke OFF.
•
Set the spray elevation and oscillation stroke to meet anticipated requirements.
Ensure the black knob securing the elevation angle is tight.
•
Ensuring yourself and others are well clear of the spray zone, start the Commando
unit.
•
Once up to pressure and ensuring the spray zone remains clear of people, gently
open the HP water valve and when fully open, check that the spray is going where
required.
Any further adjustment of the spray elevation angle or stroke should only take place
with the HP water valve isolated/ Commando engine stopped.
8.5 FROST PROTECTION
•
It is essential to protect the unit from damage by frost.
When frost is
anticipated therefore, either drain the unit or store it inside where temperatures are
above 0
o
C