d) Plug the power cord back into the power source.
e)
If the power source is DC,
plug the input cable back into the power supply.
Do not power cycle the satellite router by unplugging
the power cord from the router’s rear panel. Doing so could result in static electricity discharge
that could shock you and/or damage the router.
7.
Check the
Web Acceleration Status
field again.
If Web Acceleration is still not operational, contact your service provider for assistance.
Confirming NOC connectivity
Use the Connectivity Test page to check connectivity to the Hughes Network Operations Center
(NOC). You may want to open a second web browser to access the Help page while you execute
a connectivity test.
1.
Click
Connectivity Test
on the System Control Center page to access the Connectivity Test
page.
Figure 74: Connectivity Test – initial page
2.
Click
Start Test
. The Connectivity Test results page appears.
93
HN9400 Satellite Router Installation Guide
1038554-0001 Revision B
Chapter 8
Troubleshooting
Summary of Contents for HN9400
Page 1: ...1038554 0001 Revision B March 2 2011 HN9400 Satellite Router Installation Guide ...
Page 10: ......
Page 16: ......
Page 26: ......
Page 34: ......
Page 68: ......
Page 74: ......
Page 92: ......
Page 120: ......
Page 124: ......
Page 128: ......
Page 134: ...HN9400 Satellite Router Installation Guide 122 1038554 0001 Revision B Index ...