www.humancaregroup.com
11
ENGLISH
Maintenance and service
Inspection, care and maintenance
check list
User inspections of this accessory should be
carried out together with the Floorline bed
every 6 months.
Check:
See bed description, accessories and
all functions
• Check for Damage/Cleanliness
• Confirm Secure
• Perform Adjustment/Cleaning
OK
Faults:
Action
Cleaning
Parts to Order
VISUAL CHECK of the Components
Nuts/Bolts, Screws/Pins, Hinges/
Mounts/Bushes-component fixing
points
Wear/Damage, Tighten & Secure
Clean & Free
Painted steel components
Intact, Clean & Securely Fitted
PERFORMANCE CHECK
Accessories
Confirm Full Operation
Inspector’s Name:
Inspector’s Signature:
Inspection result:
Date:
If any problem persists, please call the customer service in your country.
Recycling
The product is built mostly from steel, or
stainless steel. The surfaces have been finished
with an electro‐coated powdercoating.
Incorrect disposal of this equipment and its
component parts may produce substances that
are hazardous to the environment. Dispose of
in accordance with all applicable national and
local regulations.