43053-01 - 09/12/2011
8
5/8
1/2
5/8
1/2
B12
B11
B13
1/8"
Bit
B14
B15
B16
New construction suspended between joist
Position the correct depth mark at the bottom edge of the
joist based on the thickness of your sheetrock.
Drill a hole in the center of each outline.
Attach the rails onto the screws.
Slide the mounting rails into brackets.
Mark position of screws by using holes as a template.
Insert screws, leaving space between the screw head and the
joist. Screws are not provided.