background image

OPERATION

5

Test Headrail Operation

 

Use the manual control button on the motor to test the operation of the headrail, following 
the sequence below.
1. Press and hold the manual control button for 6 

seconds. The sheer will move slightly.

2. Release the manual control button. The sheer 

will move to its fully open position to set the 
OPEN travel limit, then move to the fully closed 
position to set the CLOSE travel limit. Next, the 
vanes will rotate counter-clockwise and then 
clockwise to set the rotation limits. The sheer 
will move slightly one more time to indicate that 
the travel limits have been set.

NOTE:  

There could be up to an 8 second pause between the vanes tilting from counter-

clockwise to clockwise.

 

Pressing the manual control button while the carriers are traversing or the pinion clips are 
rotating will stop the action. The next button press will traverse the carriers or rotate the 
pinion clips in the opposite direction.

Using the PowerView

 Remote

First, activate the remote by pulling both plastic tabs from the back battery compartment.

IMPORTANT:  

If you have more than one remote, see “Adding Additional Remote(s) to the 

PowerView

 Shade Network” in the 

PowerView Motorization Remote Control Guide.

Manual 

Control 

Button

Group 1

Group 2

OPEN

CLOSE

Group 3

Group 4

Group 5

Group 6

Favorite

(Sheer/vane position)

LEFT ARROW

Rotates vanes clockwise

RIGHT ARROW

Rotates vanes counter-clockwise

STOP

(Press and hold for 
programming mode)

Summary of Contents for Luminette PowerView

Page 1: ...be fastened into wood whenever possible Use drywall anchors when mounting into drywall When attaching brackets into drywall additional brackets may be required to keep the headrail level after the fa...

Page 2: ...about one fourth turn to release the spring latch and pull down gently on the motor assembly to separate Method 2 This method works best when fabric is still installed on the headrail Insert a hex key...

Page 3: ...f snapping the motor onto the drive assembly seems difficult grasp the lead carrier and pull the carriers slightly away from the motor as shown at right The motor should now snap in easily If you remo...

Page 4: ...the C clips provided Hide the cable behind the fabric making sure it does not impede operation Space the C clips approximately 15 apart along the extension cable as shown Plug the DC power supply into...

Page 5: ...e up to an 8 second pause between the vanes tilting from counter clockwise to clockwise Pressing the manual control button while the carriers are traversing or the pinion clips are rotating will stop...

Page 6: ...2 Press all or groups 1 6 to select the specific sheer s to operate The group button s will light to show they are selected a Multiple group buttons may be selected at a time b To deselect a group pr...

Page 7: ...1 Press and hold the manual control button for 6 seconds The sheer will move slightly 2 Release the manual control button The sheer will move to its fully open position to set the OPEN travel limit th...

Page 8: ...135103639 2016 Hunter Douglas All rights reserved All trademarks used herein are the property of Hunter Douglas or their respective owners 9 16...

Reviews: