INSTALLATION
28
Left Stack/Right Facing Assembly
IMPORTANT:
Traverse the shade open and closed to test for proper operation.
Use the operating cord or wand to traverse the carriers to the stacked position.
■
Manually stack the free carriers in the front channel to the left end. Reposition these as
■
needed while installing each panel.
Locate the panel marked “REAR PANEL – INSTALL FIRST.” This is the fi rst panel to install.
■
Locate the temporary plastic fabric hanger installed in the headrail. You will install the
■
fi rst panel here. Remember the carriers to which the hanger is installed, then remove the
temporary hanger. Twist gently to remove.
With the front side of the rear panel facing you, insert the RIGHT side of the fabric hanger
■
into the carrier in the FRONT channel (see No. 1).
If you have 17" panels, slide the center guide into the center channel in the headrail
■
(see No. 2).
Gently twist the fabric hanger outward and insert the LEFT side of the fabric hanger into the
■
carrier in the REAR channel (see No. 3).
IMPORTANT:
After you have installed the fi rst panel, verify that the fl ush end cap on the
bottom weight is on the RIGHT side. The fl at side of the bottom weight should face the room.
Continue installing panels, front channel fi rst. The last panel you will install will be marked
■
“FRONT PANEL – INSTALL LAST.”
IMPORTANT:
This panel has two fl ush end caps on the bottom weight.
Test traverse.
■
Left Stack/Right Facing
Front Channel
Rear Channel
Rear
Carrier
Center
Channel
Center Guide
Front Carrier
3.
Insert the left side of
the fabric hanger into
the rear carrier.
2.
Put the center guide into
the center channel
(17" panels only).
1.
Insert the right side of
the fabric hanger into
the front carrier.
Summary of Contents for Skyline Gliding Window Panels
Page 1: ...Installation Operation Care Skyline Gliding Window Panels...
Page 54: ...Notes...
Page 55: ......