Page 8
STEP 3:
Attach the tongue assembly (5) to the tank assembly (4) using two 1/2” NC x 4-1/2” hex cap bolts (1), two 1/2”
lock washers (2) and two and two 1/2” hex nuts. Tighten. (3).Tighten.
ITEM NO
PART NO.
DESCRIPTION
QTY.
1
O/L
1/2”NC x 4-1/2” Bolt
2
2
O/L
1/2” Lock Washer
2
3
O/L
1/2” NC Hex Nut
2
4
401102R22
Tank Assembly
1
401102RC22
Tank/Assembly (CA)
1
5
40126300
Tongue Assembly
1
O/L- Obtain locally. Common fasteners available through hardware
and farm stores.
ITEM NO.
PART NO.
DESCRIPTION
QTY.
1
401613R0
Beam Assembly
1
2
071022WC
Pivot Pin
1
3
O/L
1/2”-3/4” R Clip Pin
1
O/L- Obtain locally. Common fasteners available through hardware
and farm stores.
STEP 4:
Stand the beam (1) up on end. Two people may be needed for this step to ensure safety. Make sure that the
beam is stable and on a level surface.Remove the pivot pin (2) and clip pin (3) from the tank assembly.Roll the
tongue/ tank assembly into position between the two tabs on the beam (1). Slide the pivot pin (2) through the
aligned holes and lock in place with the clip pin (3)
4
5