seRVICe JoURnal
32
Action
Date, stamp, signature
delivery service has been carried
out.
no remaining notes.
certified:
break the packaging and make sure the machine has not been
damaged in transport.
Where applicable, assemble accompanying components.
check that machine design corresponds to customer order.
check that the right amount of oil is in the engine and transmission.
check that the working equipment is properly set.
check that the drive sprockets are aligned.
check that the chain is properly adjusted.
lubricate machine as described in lubrication schedule.
fill the fuel tank and start the engine.
check all operating instruments.
check decals and information attached to the unit.
check the engine speed (rPm), see technical data.
check for leakage.
Inform the customer about:
the need and advantages of following the service schedule.
the need and advantages of leaving the machine for
service every 300 hours.
the effects of service and maintaining a service journal on
the machine’s resale value.
fill in the sales papers, etc.
After first 20 hours
change engine oil.
check that the chain is properly adjusted.
tighten screws and nuts.
check the oil in the clutch case.
lubricate per lubrication schedule
Delivery Service
Summary of Contents for 966997301
Page 2: ... 2010 All rights reserved Printed in U S A ...
Page 28: ...28 REPAIR PARTS 1 2 3 4 5 6 7 8 9 10 11 DECALS ...
Page 30: ...30 CABLE LAYER SHAPER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 13 18 REPAIR PARTS ...
Page 33: ...SERVICE JOURNAL 33 Action Date stamp signature ...
Page 34: ...SERVICE JOURNAL 34 Action Date stamp signature ...
Page 35: ......
Page 36: ...P N 115124026R1 08 16 10 ...