• If the front part of the product makes a hole in the
concrete surface, add concrete in front of the rear
part of the product. The concrete fills the hole.
• During operation, examine the height of the concrete
(C) in front of the 2 parts of the product. Correct
height is 10–20 mm/0.4–0.8 in.
C
Note: If the height of the concrete is more than 20
mm/0.8 in., the product becomes too heavy to pull
and the concrete surface behind the product is not
smooth. If the height of the concrete is less than 10
mm/0.4 in., the vibrations do not give a good result.
• At the end of the work area, stop the vibrations
before you stop the movement of the product.
CAUTION: Do not pull the product back
across the concrete surface. If it is
necessary to operate the product a second
time across the work area, lift the product
and move it back to the start.
To stop the electric drive unit (BE 20)
1. Set the power switch to OFF.
2. Disconnect the power cord from the power source.
WARNING: Always disconnect the
power cord from the power source when
the product is not in operation.
To stop the fuel drive unit (BE 30)
1. Move the throttle control to the idle speed position.
2. Set the engine ON/OFF switch to OFF. The engine
stops.
3. Move the fuel valve to the OFF position.
Maintenance
Introduction
WARNING: Read and understand the safety
chapter before you do maintenance on the
product.
Maintenance schedule
* = General maintenance done by the operator. The
instructions are not given in this operator's manual.
X = The instructions are given in this operator's manual.
O = Refer to the engine manual for instructions.
General maintenance, all models
Each use
Clean the product.
X
Examine the product for damages.
*
Make sure that nuts and screws are tightened.
*
BE 30
Each
use
After the
first 20h
Each
50h
Monthly or
each 200h
Each 3
months or
each 300h
Make sure that there are no fuel or oil leaks.
*
12
1299 - 001 - 14.04.2020