wc_tx000640gb.fm
38
Maintenance
CRT 36
4.9
Drive Belt
To replace the drive belt
:
1. Place the trowel on a flat, level surface with the blades pitched flat.
2. Turn engine off and disconnect battery.
3. Remove the beltguard.
4. Remove 2 bolts
(a)
, washers
(b)
and nuts
(c)
from each bearing flange.
5. Remove the 4 bolts
(d)
holding each inside universal joint to the shaft fitting.
Remove universal joints and shims (if included) from ends of drive shaft.
6. Lift the drive pulley up far enough to slide belt past.
7. Remove the old belt and install a new one.
8. Reverse the procedure for assembly. Align the bearings and shaft as straight as
possible. Adjust pulley offset and center distance to values as shown.
9. Torque the bearing bolts
(a)
to 99±10 ft.lbs. Torque the universal joint bolts
(d)
to
10±1 ft.lbs.
Summary of Contents for CRT 36-25
Page 4: ...CALIFORNIA Proposition 65 Warning wc_tx004643en fm 4 Notes ...
Page 8: ......
Page 17: ...CRT 36 Labels wc_si000378gb fm 17 2 Labels 2 1 Label Locations C D B J Z ...
Page 18: ...Labels CRT 36 18 wc_si000378gb fm BB AA ...
Page 23: ...CRT 36 Labels wc_si000378gb fm 23 Notes ...
Page 24: ...wc_tx000639gb fm 24 Operation CRT 36 3 Operation 3 1 Features and Controls ...
Page 54: ...wc_tx001324gb fm 54 Schematics CRT 36 7 Schematics ...
Page 56: ...wc_tx001324gb fm 56 Schematics CRT 36 Notes ...
Page 73: ...33 Notes 34 Notes ...