Complete Service and Repairs Before
Machine is Released
Tighten all bolts, fittings, and connections to torques
specified by the manufacturer.
Inspect for leftover components such as cotter pins,
washers, locknuts, etc. after completing service.
Replace any missing parts.
Start the engine and check for leaks. (See page 27,
Hydraulic System Hazards
.) Operate all controls to
make sure the machine is functioning properly. Test
the machine if necessary. After testing, shut down and
check the work you performed.
Recheck all fluid levels before releasing the equipment
for operation.
All parts should be inspected during repair and replaced
if worn, cracked or damaged. Excessively worn or
damaged parts could fail and cause injury or death.
Install all guards, covers, and shields after servicing.
Refill and recharge pressure systems only with
manufacturer-approved or recommended fluids.
Verify service work
when completed
Pressurized fluid
can inject into
the body
31
Perform Maintenance Safely
31
32
Notes
Summary of Contents for CRT 48-35L
Page 4: ...CALIFORNIA Proposition 65 Warning wc_tx004643en fm 4 Notes ...
Page 8: ......
Page 12: ...Table of Contents CRT48 wc_bo5100022491_09TOC fm 12 ...
Page 21: ...wc_si000969gb_FM10 fm 21 CRT48 Safety Information Notes ...
Page 82: ...wc_td000668gb_FM10 fm 82 Technical Data CRT48 Notes ...
Page 111: ...33 Notes 34 Notes ...
Page 113: ...CRT48 Schematics wc_tx004197gb_FM10 fm 113 14 Schematics Notes ...
Page 120: ......