4.13
Adjusting the Pitch
Background
Changing the pitch (angle) of the trowel blades enables the operator to finish
concrete from the wet surface stage through the hard finishing stage (burnishing).
Changing
pitch angle
Perform the procedure below to change or set the pitch angle of the trowel blades.
1. Slow the machine.
2. Set the desired pitch on the left side of the machine. To increase the pitch, turn
the pitch control inward
(a)
.
3. Adjust the right side to match.
4. Use the pitch indicator
(b)
to adjust pitch equally on both right and left trowel
blades.
Suggested
working pitch
wc_gr013211
a
b
5-10 º
15º
20-25
º
Working conditions of concrete
Suggested working pitch
1. Wet surface working stage
Flat (no pitch)
2. Wet to plastic working stage
Slight pitch (5–10°)
3. Semi-hard working stage
Additional pitch (15°)
4. Hard finishing stage (burnishing)
Maximum pitch (20–25°)
Summary of Contents for CRT 48-35L
Page 4: ...CALIFORNIA Proposition 65 Warning wc_tx004643en fm 4 Notes ...
Page 8: ......
Page 12: ...Table of Contents CRT48 wc_bo5100022491_09TOC fm 12 ...
Page 21: ...wc_si000969gb_FM10 fm 21 CRT48 Safety Information Notes ...
Page 82: ...wc_td000668gb_FM10 fm 82 Technical Data CRT48 Notes ...
Page 111: ...33 Notes 34 Notes ...
Page 113: ...CRT48 Schematics wc_tx004197gb_FM10 fm 113 14 Schematics Notes ...
Page 120: ......