English –
21
WARNING!
No service procedures must be conducted on the engine or cutting unit unless:
•
The engine is switched off.
•
The ignition key is removed.
•
The ignition cable is removed from the plug.
•
The parking brake is applied.
•
The cutting unit is disengaged.
Maintenance
50
25
100
MAINTENANCE
Page
Maintenance interval
in hours
Daily
mainte-
nance
before start
Maintenance schedule
The following is a list of the maintenance which should be conducted on the machine. For the items which
are not described in these instructions go to an authorised service workshop.
●
= Described in these instructions.
❍
= Not described in these instructions.
1)
First change after 5 hours.
2)
During dusty conditions cleaning and replacement should be more frequent.
3)
For daily use of the
machine lubrication should be conducted twice a week.
4)
Conducted by authorised service workshop.
Check the engine’s oil level
37
●
Check the engine’s cooling air inlet
30
●
Check the fuel pump’s air filter
28
●
Check the steering wires
24
●
Check the brakes
25
●
Check the battery
28
●
Check the safety system
29
●
Check screws and nuts
–
❍
Check for fuel and oil leakage
–
❍
Change the engine oil
1)
37
●
Clean the air filter’s pre-filter (foam plastic)
2)
27
●
Check the cutting unit
31
●
Check the tyre pressures (60 kPa)
30
●
Lubricating the belt adjuster
3)
38
●
Lubricate joints and shafts
3)
39
●
Adjust the brakes – Rider 11 and Rider 11 Bio
25
●
Check the V-belts
–
❍
Check the transmission’s cooling flanges –
–
❍
Rider 13 and Rider 13 Bio
Check the transmission’s oil level – Rider 13 and
39
●
Rider 13 Bio
Adjust the brakes – Rider 13 and Rider 13 Bio
25
●
Check and adjust the throttle wire
26
●
Clean the cooling flanges on the engine and
–
❍
transmission
2,4)
Replace the air filter’s pre-filter and paper filter
2)
27
●
Replace the fuel filter
26
●
Replace the plug
28
●
Summary of Contents for SG 13 B
Page 2: ...Svenska 31 ...
Page 48: ...46 English SERVICEJOURNAL Work done Date mileage stamp sign ...
Page 49: ...English 47 SERVICEJOURNAL Work done Date mileage stamp sign ...
Page 50: ... H r 6C SERVICEJOURNAL Work done Date mileage stamp sign ...
Page 51: ...English 49 ...
Page 52: ... H r 6C 2002W07 114 00 48 26 ...