H1 Self Contained glass front multideck
Installation manual
________________________________________________________________________________________________________________________
Hussmann
Page
6
CAUTION
Care must be taken to avoid damage to drainage
outlets and electrical equipment mounted under or
at the rear of cases.
Shipping Damage and Shortages
If possible, it is recommended that packaging be removed from the cases before they are moved into the store.
After removing packaging, inspect the case for any shipping damage and ensure that all case inclusions, such as trims
etc are accounted for. Immediately report any shipping damage to the carrier and inform Hussmann of any short supplies.
Installation
NOTE
Information in this manual is to be followed in conjunction
with specifications, work practices and regulations of the
customer, installing company and relevant industry.
Positioning and Levelling
CAUTION
Ensure the lifting capacity of the trolley, etc if used is
sufficient for the case. Refer to the product engineering
data tables at the front of this manual for case weights
and Risk Analysis (page 14).
To position the cases:
Once case is in position adjust the feet so the case is fully supported by the feet and level (Ensure the case is level
to
/- 1.5mm
from front to back and side to side and chassis of case is
NOT twisted
).