BEXDWG
P/N 3093114_A 1-13
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Offsetting Bumper (for Merchandiser Lineup)
1. Locate bumpers for the sides of the
lineup. The bumpers are shipped with the
merchandisers.
2. Refrigerate the merchandiser lineup for at
least six (6) hours.
The offsetting bumpers sections
should be kept inside a cooler or refrigerated
merchandiser during this time.
This will allow
the bumper to contract and provide for a good
fit and finish.
3. To install offsetting
bumpers:
a. Remove bumpers from
cooler. Measure bumpers and
cut to appropriate length. Use
a miter box and fine-tooth
saw.
b. Insert internal joint trims
first. Install bumpers offset across
joints along the side of the lineup
as shown in the illustration below.
Joint trim provides stability for the
bumpers, and lends to a smooth fit
and finish.
4. Make sure no gaps exist between sections
at each end of field cut bumpers.
5. Verify fit and finish at both sides of corner
extrusion. If bumpers are cut too long, the
corner extrusion may bow out, resulting in an
unattractive finish.
6. Remove protective film from bumper once
installation is complete.
Bumper
Miter Box