background image

IGIC-CID-0508

10

Copper Coils

The copper coils used in Hussmann merchandisers may 

be repaired in the field. Materials are available from local 

refrigeration wholesalers.
Hussmann recommends using #15 Sil-Fos for repairs.

Tips and Troubleshooting

Before calling for service, check the following:

1.   Check electrical power supply to the equipment for 

connection.

2.   Check fixture loading. Overstocking case will affect 

its proper operation.

3.   If frost is collecting on fixture and/or product, check 

that Humidity Control is working properly, and that 

no outside doors or windows are open - allowing 

moisture to enter store.

Electrical Wiring Diagrams

CID

Crowns

5'

W0300001

6'

W030000

Center (Double sided)

4'

W0300003

Center (½ side)

4'

W0300004

End Cap (HMR Unit)

3'-8"

W0300005

FOR PROMPT SERVICE

When contacting the factory,

be sure to have the Case Model and Serial

Number handy. This information is on a plate

located on the case itself.

Summary of Contents for CHINO CID

Page 1: ...CID ISLAND CHEESE DELI CASE p n IGIC CID 0508 INSTALLATION OPERATION GUIDE CHINO CID ISLAND CHEESE DELI CASE Rev 0508 Installation Operation Manual...

Page 2: ...Self Service Island Display including 5 and 6 Crowns and 4 Center Modules available as standard refrigerated med low temp and hot Shipping Damage All equipment should be thoroughly examined for shipp...

Page 3: ...Rev 0508 Cut and Plan Views...

Page 4: ...he store floor B When wedges are involved in a lineup set them first All cases were leveled and joined prior to shipment to insure the closest possible fit when cases are joined in the field When join...

Page 5: ...nd product losses Please follow the recommendations listed below when installing condensate drains to insure a proper installation 1 Never use pipe for condensate drains smaller than the nominal diame...

Page 6: ...case setup the connecting point in the store may be 5 8 7 8 or 11 8 Refer to the particular case you are hooking up Refrigerant lines should be sized as shown on the refrigeration legend furnished by...

Page 7: ...ntended for computerized scales with a five amp maximum load not for large motors or other high wattage appliances It should be wired to a dedicated circuit Finishing Touches Plexiglass Joining Instru...

Page 8: ...d product life at the factory The use of higher output fluorescent lamps H O and V H O will shorten the shelf life of the product Case Cleaning Long life and satisfactory performance of any equipment...

Page 9: ...very effective in not only cleaning and polishing the Plexiglass surface but also providing anti static and anti fog capabilities This product also seals pores and provides a protective coating Insta...

Page 10: ...Check fixture loading Overstocking case will affect its proper operation 3 If frost is collecting on fixture and or product check that Humidity Control is working properly and that no outside doors or...

Page 11: ...120 L BALLAST 125 01 3266 FULHAM LH3 120 L BALLAST 125 01 3266 FULHAM LH3 120 L BALLAST 125 01 3266 FULHAM LH3 120 L BALLAST 125 01 3266 FULHAM LH3 120 L CAP UNUSED RED LEAD LIGHT SWITCH BUNDLE COLOR...

Page 12: ...AM LH3 120 L CAP UNUSED RED LEAD LIGHT SWITCH BUNDLE COLOR ORANGE 115 VAC 50 60 Hz M M M 115 VAC 50 60 Hz BUNDLE COLOR BROWN 115 VAC 50 60 Hz BUNDLE COLOR BLACK WHITE EVAPORATOR FAN MOTORS 3 GE 9 W 11...

Page 13: ...25 01 3266 FULHAM LH3 120 L BALLAST 125 01 3266 FULHAM LH3 120 L LIGHT SWITCH BUNDLE COLOR ORANGE 115 VAC 50 60 Hz 115 VAC 50 60 Hz BUNDLE COLOR BROWN 115 VAC 50 60 Hz BUNDLE COLOR BLACK WHITE EVAPORA...

Page 14: ...ST 125 01 3266 FULHAM LH3 120 L LIGHT SWITCH BUNDLE COLOR ORANGE 115 VAC 50 60 Hz 115 VAC 50 60 Hz BUNDLE COLOR BROWN 115 VAC 50 60 Hz BUNDLE COLOR BLACK WHITE EVAPORATOR FAN MOTOR 1 GE 9 W 115 VAC SU...

Page 15: ...z M M M 115 VAC 50 60 Hz BUNDLE COLOR BROWN 115 VAC 50 60 Hz BUNDLE COLOR BLACK WHITE EVAPORATOR FAN MOTORS 3 GE 9 W 115 VAC SUCTION SOLENOID OPTIONAL T STAT OPTIONAL BALLAST 125 01 3266 FULHAM LH3 12...

Page 16: ...les and Hot Wells b Observation of outside influences such as drafts radiant heating from the ceiling and from lamps Such influence should be properly corrected or compensated for c Complete start up...

Page 17: ...e opening c READING It should first be determined that the refrigerator is refrigerating and has operated at least one hour since the end of the last defrost period The thermometer reading should be m...

Page 18: ...rea s Cleaning practices particularly with respect to proper refrigerator unloading and warm up must be in accordance with applicable recommendations 1 1 Cleaning of non frozen food equipment should i...

Page 19: ...e cleaning of equipment within the compartment and the hot area s Cleaning practices particularly with respect to proper refrigerator unloading and warm up must be in accordance with applicable recomm...

Page 20: ..._________________________________ _______________ ___________________________________________________________________________________________________ _______________ __________________________________...

Reviews: