P/N 558756_C
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
5
EcoVision EZ Door Upgrade
5
Install insulation and inner bottom rail
supports.
A.
Clean sealers and (or) Perma-gum off
front supports before attaching insulation
or bottom rail support
B.
Insert insulation with notched side toward
the outside of the case (3) per 12 ft case,
(2) per 8 ft case as shown in Figure 5-1
and 5-2.
C.
Install inner bottom rail support and
attach it to the front supports using #8 x
3
/
8
in. screws.
6
Attach the outer bottom rail support
to the front of the case with #8-18 x
1
/
2
in. screws.
Figure 5-1
Insulation
Inner Bottom
Rail Support
Inner Bottom
Rail Support
Insulation
Outer Bottom Rail
Support
Figure 5-2