Low Temperature
Excel
P/N 0467434_P
1-7
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
1. Remove and retain any factory-installed
fasteners.
2.
Move merchandisers in lineup as close as
possible by pushing or using lever bar (mule).
3.
Verify upper front panel, front panel, bumper
retainer, and top rail alignment
before
joining
merchandisers, and shim as necessary. Panels
and Top Rail must have equal overhang at each
end of merchandiser.
NOTE:
Merchandisers must be leveled before
joining.
Verify all top rails, panels and bumper
retainers of each merchandiser to be joined
align vertically before joining.
To correct vertical alignment of top rails and
upper front panel, adjust shims as necessary.
Verify alignment of panels, bumper retainer and
top rail.
Shim cases to ensure vertical alignment of panels
and top rails.
Install fasteners (parent to parent).
Shims