Low Temperature
Excel
P/N 0467434_P
1-21
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
If top rails are not factory installed,
1. Begin by installing a 48-inch top rail against
the corner trim of the LH end case. Refer to
1
in the illustration below.
2. Install a second 48-inch top rail against the
corner of the RH end merchandiser. Refer to
2
in the illustration below.
3. Once all except the last section of top rail
have been installed refrigerate the merchandiser
lineup for at least six (6) hours.
The last section
of top rail should be kept inside a cooler or
refrigerated merchandiser during this time.
This
will allow the top rail to contract.
4. Tap the top rail to close any gaps.
5. Measure the center section,
3
in illustration
below, and cut Top Rail to fit. Use a miter box
and fine-tooth saw to cut last top rail to length.
Install the last section.
6.
Remove protective film from top rail once
installation is complete.
OPTIONAL STAINLESS STEEL TOP RAIL
Stainless steel top rails are not offset. Install
trim at each joint as indicated below.