1-22
I
nstallatIon
P/N 0467434_P
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM
INSTALLING FLUE GLASS — FNG & FIG
The louvers, flue glass, retainer and brackets
are shipped loose and must be installed before
the lineup can be started up.
1. Apply flue glass Retainer to the top of
each section of flue glass.
2. Position the glass in the merchandiser.
3. Slide a Discharge Deflector Bracket
into each bend of the and into the flue glass
retainer.
INSTALLING FLUE GLASS CLAMP
(FWGH & FWEGH)
The flue glass retainer is installed as shown
below. Insert supplied bolts (4) through retainer,
Bolts fasten into factory-installed nut retainers.
The flue glass is packed inside of the case.
Remove the packaging, and slide flue glass
securely into top lip of flue glass retainer.
Fasten (4) bolts into nut retainers (7f lbs).
DO NOT over-tighten bolts.
INSTALLING PARTITIONS
To join same temperature fixtures on
different defrost cycles, an acrylic partition
kit is required.
To join unlike fixtures, or like fixtures operating
at different temperatures, an insulated partition
kit is required. It must be installed when setting
the lineup. Instructions for installing these
partitions are included with the kits.
Discharge
Deflector
Bracket
Flue
Glass
Retainer
Flue
Glass
Discharge
Deflector
Bracket
Flue Glass
Retainer
Discharge
Deflector
Bracket
Flue
Glass
Retainer
Nut Retainer
Retainer Bolt
Flue Glass
Flue Glass Retainer