P/N 0515388_L
1-15
Medium Temperature
Excel
with
EcoVision II Doors
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Caution: Tipping Hazard
Case tipping may occur if cases are not
properly leveled and secured.
HOOK SEISMIC RESTRAINT
BRACKET OVER BASE RAIL
AND TIGHTEN AFTER CASE IS
IN PLACE
SQUARE
PLATE WASHER
ANCHOR-WEDGE
3/4-10 x 4-3/4
SEE NOTES
REACH UNDER
CASE TO INSTALL
BRACKET
FRONT BACK
SEE NOTES
MINIMUM
DEPTH 3-3/8 INCHES
MAXIMUM
DEPTH 3-7/8 INCHES
FIELD INSTALLATION OF SEISMIC RESTRAINTS
3/4-10 NUT
SEISMIC
RESTRAINT
BRACKET
Notes
Determine hole locations and set all anchors before case
is in place. Avoid obstructions under case or on floor when
planning anchor locations. Two brackets required at each
case joint and case end. See plan view. Equal number of
brackets should be on front and back of case.
PLAN (TOP) VIEW
ANCHORS REPRESENTED BY “X”
CASE LINEUP
STANDALONE CASE